• About
    • Mission Statement
    • Corporate Values
    • History
  • Safety
  • News
  • Contact Us
  • Careers
  • Engineering
  • Fabrication
  • Industrial Piping Systems
  • HVAC Systems
  • Plumbing
  • Project Portfolio
  • About  
    • Mission Statement
    • Corporate Values
    • History
  • Safety  
  • News  
  • Contact Us  
  • Careers  
Corporate Headquarters | 769 Chicago Road | Troy, MI 48083 | 248.548.4900  
Engineering Fabrication Industrial Piping Systems HVAC Systems Plumbing
Project Portfolio
  • Home
  • Project Portfolio
  • GM Spring Hill

GM Spring Hill

40’ pipe racks going in the paint trestle (UPI's Body Shop Project)
Previous Next

Customer:
General Motors

Location:
Spring Hill, TN

Project:

UPI extended their mechanical expertise beyond the GK new paint shop project and is completing work throughout the entire GM Spring Hill complex. 

BODY SHOP

  • Fabrication & installation of all new utility piping and equipment
  • Systems include chilled water, welder water, non potable water, potable cold water, pumped sanitary, industrial waste, natural gas, compressed air, totaling over 9 miles.
  • Equipment includes CHW, WW and IW pumps, heat exchangers, air handling units, chemical treatment, filtration and instrumentation
  • 7,500 sqft existing body shop addition with storm, compressed air and potable cold water.

GENERAL ASSEMBLY

  • Fabrication and installation of chilled water, natural gas compressed air utility piping. 
  • Replace and upgrade cattery coolant tanks, pumps and process piping.

PAINT SHOP

  • Fabrication & installation of all new utility, process piping and equipment.
  • Systems include basecoat, clearcoat, prime & tu-tone paint circulation, solvent, sludge, humidification, high purity water, high pressure wash, drainage, dry compressed air, chilled water, heating hot water, non potable water, potable cold water, pumped sanitary, industrial waste, natural gas, plant compressed air totaling over 42 miles.

WASTE WATER

  • Systems include process waste, sulfuric acid, potable water, compressed air and all chemical systems.

Over a two-year period, UPI self-performed approximately 300,000 field hours, and at the peak of the project, we had approximately 250 trades on-site.

Customer:
Multiple

Location:
GM Orion Assembly Plant

Project:
Turn-Key Mechanical Systems

View This Project  

Customer:
Gallagher-Kaiser

Location:
Kansas City, KS

Project:
Complete Paint Shop

View This Project  
Corporate Headquarters
769 Chicago Road
Troy, MI 48083
248.548.4900
  • Engineering Services
    • Design/Build
    • 3D Modeling
    • BIM
  • Fabrication
    • Pipe Fabrication
  • Industrial Piping Systems
    • Utility
    • Process
    • Paint
    • Conveyance
    • Hydraulic
    • Chilled Water &
      Hot Water
    • Design/Build
    • Steam
    • Waste Piping
  • HVAC Systems
    • Utilities
    • Steam
    • Chilled Water
    • Hot Water
    • Design/Build
  • Plumbing